Construction of an earth shelter -- Boscobel,
WI
Back to images
|

Windows are framed. |

Wood studs were fitted to the
dome
by a clever carpenter, David Lewallen
of Boscobel, who made small cuts on
the backside of the 2x4s allowing them
to bend to the ceiling. |
 |

Drywall has now been placed
over the studs to frame out the bedroom.
|

September 10, 2003 - With the
ceiling plastered inside, David Lewallen stuccos the outside
overhang.
|

This view of the living room
shows the textured plastered ceiling.
|

A view of the interior utility
room from the hallway. Notice the light spot in
the upper left of the picture. It is from the light tube
(see photo right).
|

A light tube brings light to
the interior utility room.
|

Stucco is complete on the front of the
building.
|

The driveway is being sealed. |

Detail of window frame and stone work. |

The mound over the house has
been seeded with ‘No-mow’ grass in late September
2003
|
 The
finished earth shelter home
|
Back to
top
|